The drawbridge over the Mispillion River on Rehoboth Boulevard between Evans Street and Route 14/Front Street in Milford will be closed for inspection on Oct. 22 from 9 a.m. until 2 p.m.

The drawbridge over the Mispillion River on Rehoboth Boulevard between Evans Street and Route 14/Front Street in Milford will be closed for inspection on Oct. 22 from 9 a.m. until 2 p.m.

The right lane and shoulder will be closed southbound for inspection first, and then the northbound right lane and shoulder will be closed for inspection on Oct. 22, pending weather conditions

DelDOT alerts motorists that bridge personnel and equipment will be operating in close proximity to the travel lanes.

For more information visit www.deldot.gov.